Instructions for ARM devices: Complete this test suite after installing the generic system image (GSI) and once again after installing the Foundation image. The device’s previous functionality should remain intact. These tasks run through several essential scenarios to ensure the device is fully compatible with Project Treble.
Instructions for x86 devices: Complete this test suite after installing the Foundation image.
Test Suite
After completion, share the test results with your Esper representative.
If a component in the test suite fails, reach out to your manufacturer for assistance.
Item No. | Test | Results |
1 | Factory reset the device. | |
2 | Reboot or power down the device. | |
3 | Add Wi-Fi or Ethernet to the device. | |
4 | Enable Android Debug Bridge and pull hardware information, logcat, and bug reports. | |
5 | If applicable, enable and check its Bluetooth, BLE, and/or NFC settings. | |
6 | If applicable, test its touchscreen capabilities. | |
7 | If applicable, test its peripherals. | |
8 | If applicable, test its external storage capabilities such as plugging in a USB drive and saving data. | |
9 | Check the display density and test resizing. | |
10 | If applicable, check the keyboard, mouse, and external display capabilities. | |
11 | If applicable, check external and/or built-in audio capabilities. |
Instructions for ARM devices:
After completing the test suite, you can flash Foundation on the device.
After flashing Foundation and completing the test suite a second time, provision the device to the Esper console.
Instructions for x86 devices:
If you have not already done so, provision your device to the Esper console.